Natural gas line laid first time to two more settlements in Khachmaz

16:02 - 17.09.2018


September 17, Fineko/abc.az. A natural gas line has been laid to Krasniy Khutor village and Turist settlement of Khachmaz district. The ceremony of its opening was attended by reps of the Khachmaz District Executive Power and Socar’s sub-company Azerigaz, and reps of the public. 
For gasification of village Krasniy Khutor and settlement Turist, which are numbering 116 gas consumers, there were installed carrier and intra-quarter gas lines in polyethylene and metal pipes of various diameter on the basis of a single-stage system, with a total length of 14,021 m and 4,669 m. Each apartment was installed gas meters and individual gas regulators.
“Single-stage" control system is used in the gas distribution network of gasified settlements. This system allows each gas consumer to use an individual gas regulator and maintain the gas supplied to consumers in constant regime.

Other news