A tunnel in settlement Zabrat put into operation

18:05 - 19.02.2021


February 19, Fineko/abc.az. A road tunnel constructed in settlement Zabrat has been put into operation.

ABC.AZ was informed at Azerbaijan Railways, this crossing, built at the intersection of Octyabr Street and Musa Bayramov Street, allows the simultaneous movement of trains and cars.

Previously, the intersection of roads and railways in this area created a dangerous situation, while hindering the movement of vehicles.

The width of the Zabrat road crossing, the construction of which began in August 2019, is 8 m, the height is 5 m, and the total length is 227 m.

 

Other news