Work on construction of Goradiz-Agband railway continues at accelerated pace

12:53 - 20.06.2024


June 20, Fineko/abc.az. Azerbaijan Railways CJSC (ADY) continues construction work on Goradiz-Agbend railway line at accelerated pace.

ABC.AZ reports with reference to ADY that the construction of the 104.7 km railroad has been completed by 56%.

About 500 engineering structures are under construction, including large bridges along the Goradiz-Agbend railway line, which will connect the main part of Azerbaijan with Nakhchivan.