Azerishig builds 5 transformer substations in Shusha

17:39 - 21.10.2021


October 21, Fineko/abc.az. Work on the construction of the main power supply of the city of Shusha in the most modern form continues at a rapid pace.

ABC.AZ reports that this was informed by Aydin Kerimov, the special representative of the president in Shusha district.

According to Kerimov, currently Azerishig is constructing five transformer substations with capacity of 5 mV each.

Underground cables of 30 kV with total length of 35 km are laid into the pipe.

 

Вся лента